Concrete pouring work in front of west wing entrance of the 2nd floor of Education and Student Support Center (October 11th (Sat) to October 22nd (Wed))
Concrete pouring work will be carried out at the west wing entrance on the Education and Student Support Center.
Saturday, October 11, 2025 - Tile cutting, core drilling, and installation of side formwork.
Saturday, October 18, 2025 - Ready-mixed concrete pouring.
Monday, October 20, 2025 - Removal of formwork, installation of curbs, tile restoration, and mortar repair.
* The entrance is unavailable *
Tuesday, October 21, 2025 - Installation of curbs, tile restoration, and mortar repair.
* The entrance is unavailable *
October 22, 2025 (Wednesday) - Reserve day
Please also check the attatchment (Japanese version only) regarding the location and schedule of the work.
During the period, there will be days when the west entrance will be unavailable,
and on those days, please use the north entrance (the entrance with the ramp).
Saturday, October 11, 2025 - Tile cutting, core drilling, and installation of side formwork.
Saturday, October 18, 2025 - Ready-mixed concrete pouring.
Monday, October 20, 2025 - Removal of formwork, installation of curbs, tile restoration, and mortar repair.
* The entrance is unavailable *
Tuesday, October 21, 2025 - Installation of curbs, tile restoration, and mortar repair.
* The entrance is unavailable *
October 22, 2025 (Wednesday) - Reserve day
Please also check the attatchment (Japanese version only) regarding the location and schedule of the work.
During the period, there will be days when the west entrance will be unavailable,
and on those days, please use the north entrance (the entrance with the ramp).
Scroll